2024-2025年 '25 OSAKA-KANSAI EXPO Projects  

                                  

Coming Soon

Coming Soon

Coming Soon

 2023-2024年 OSAKA Monument Project  

                                  BIM活用事例 / BIM Usage

From the basic planning stage, BIM is used to improve the accuracy of studies.

Structural framing study of giant structures




 2023年 OSAKA Condminium Projects  

                                  BIM活用事例 / BIM usage

In the implementation design of a mid-rise apartment,

 BIM model of the adjacent neighbouring building was used to verify the line of sight from each room.


In the implementation design of a mid-rise apartment, 

BIM virtual showroom was created to facilitate the client's decision-making in determining the design of the entrance.


In the planning of a new home and clinic with an existing basement frame, BIM was used early on to minimise interference with the column positions of the new building and to minimise demolition of the existing basement frame.

 2022-2023年 

TOKYO Theme Park Project    Special Framed Structure 

2022year 

OSAKA AX building(Commercial tenant building) Exterior renewal

2019 Case Study 1


This example shows how 3D scanning technology and BIM were used to quickly create a simple CG image for an office relocation plan.

Even without existing blueprints, this technology allows for easy layout planning. It can also be used for store design, of course.


2019 Case Study 2


This was a master plan for a large-scale commercial facility site. It utilized BIM.

The business owner's level of understanding improved quickly, leading to more accurate decision-making.

2019 Case Study 3


This is a proposal to use BIM for an indoor tennis court in the Kansai region, targeted for the Tokyo Olympic and Paralympic Games.

The court, which includes a partial underground section and connections to an existing building, required complex considerations, but BIM enabled the process to be streamlined.